Elesta score at Goals Soccer Centres

North Worcestershire based Elesta partner C Squared has now completed five Goals Soccer Centres in conjunction with C.A. Sothers Ltd. The five a side soccer centres live and breathe soccer in state of the art facilities to make the sport the best experience in the UK.

Each Goals Soccer Centre has a C Squared motor control panel housing the Elesta control modules, interfacing to the Elesta (trick with a click) fascia mounted LCD display which allows adjustment of time schedules and temperature set points throughout the centre. Run & fault lamps are also provided on the control panel fascia for each item of plant controlled.

The Elesta Control System provides full functionality for temperature control and time scheduling in a user friendly English language menu format, which allows for simple adjustments by the end user. The drop down menus are bespoke for each centre to be meaningful to the user. The software is also specifically written to give maximum energy savings to the controlled plant and equipment. The plant generally consists of a gas boiler, heating pumps, hws gas fired generator, AHU, and A/C units. The AHU is controlled to provide tempered fresh air into the changing room area, whilst extract fans and A/C units are timed controlled for the bar, kitchen, office and toilet/changing areas. The BACnet enabled RCO-D controllers are IP addressable for remote communications when required in the future.